We consider a large-scale unit commitment problem arising in medium-term simulation of energy networks, stemming from a joint project between the University of Milan and a major energy research centre in Italy. Optimal plans must be computed for a set of thermal and hydroelectric power plants, located in one or more countries, over a time horizon spanning from a few months to one year, with a hour-by-hour resolution. We propose a mixed-integer linear programming model for the problem. Since the complexity of this unit commitment problem and the size of real-world instances make it impractical to directly optimise this model using general purpose solvers, we devise ad-hoc heuristics and relaxations to obtain approximated solutions and quality estimations. We exploit an incremental approach: at first, a linear relaxation of an aggregated model is solved. Then, the model is disaggregated and the full linear relaxation is computed. Finally, a tighter linear relaxation of an extended formulation is obtained using column generation. At each stage, matheuristics are run to obtain good integer solutions. Experimental tests on real-world data reveal that accurate results can be obtained by our framework in affordable time, making it suitable for efficient scenario simulations.© Alberto Ceselli, Alberto Gelmini, Giovanni Gighini, and Andrea Taverna;.
Mathematical programming bounds for large-scale unit commitment problems in medium-term energy system simulations / A. Ceselli, A. Gelmini, G. Righini, A. Taverna (OPEN ACCESS SERIES IN INFORMATICS). - In: 4th Student Conference on Operational Research, SCOR 2014Leibniz : Dagstuhl Publishing, 2014 Jul 31. - ISBN 9783939897675. - pp. 63-75 (( Intervento presentato al 4. convegno Student Conference on Operational Research (SCOR) tenutosi a Nottingham nel 2014 [10.4230/OASIcs.SCOR.2014.63].
Mathematical programming bounds for large-scale unit commitment problems in medium-term energy system simulations
A. Ceselli;G. Righini;A. Taverna
2014
Abstract
We consider a large-scale unit commitment problem arising in medium-term simulation of energy networks, stemming from a joint project between the University of Milan and a major energy research centre in Italy. Optimal plans must be computed for a set of thermal and hydroelectric power plants, located in one or more countries, over a time horizon spanning from a few months to one year, with a hour-by-hour resolution. We propose a mixed-integer linear programming model for the problem. Since the complexity of this unit commitment problem and the size of real-world instances make it impractical to directly optimise this model using general purpose solvers, we devise ad-hoc heuristics and relaxations to obtain approximated solutions and quality estimations. We exploit an incremental approach: at first, a linear relaxation of an aggregated model is solved. Then, the model is disaggregated and the full linear relaxation is computed. Finally, a tighter linear relaxation of an extended formulation is obtained using column generation. At each stage, matheuristics are run to obtain good integer solutions. Experimental tests on real-world data reveal that accurate results can be obtained by our framework in affordable time, making it suitable for efficient scenario simulations.© Alberto Ceselli, Alberto Gelmini, Giovanni Gighini, and Andrea Taverna;.File | Dimensione | Formato | |
---|---|---|---|
7.pdf
accesso aperto
Tipologia:
Publisher's version/PDF
Dimensione
460.99 kB
Formato
Adobe PDF
|
460.99 kB | Adobe PDF | Visualizza/Apri |
Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.