The luminosity upgrade of the Large Hadron Collider (LHC) at CERN requires the installation of additional collimators in the dispersion suppressor regions of the accelerator. The upgrade foresees the installation of one additional collimator on either side of interaction point 7 (IP7) at the location of the existing main dipoles (MBs) that will be replaced by shorter and more powerful dipoles, and of one additional collimator on either side of IP2 at the location of existing empty cryostats. This paper describes the design and the construction status of the full-length prototype of the 11-T dipole magnet, which is needed for IP7. This magnet features a two-in-one structure, like the LHC MB, impregnated coils made of Nb 3 Sn conductor, an inner bore of 60 mm, and a magnetic length of about 5.3 m. Two 11-T magnets are needed to replace a 15-m long MB. A by-pass cryostat placed in between the two magnets allows creating a room temperature space for the additional collimators. The magnet is designed to provide the same integrated field as the MB at nominal field. However, due to the difference in transfer function at lower field, a correction by means of a trim current has been considered. A full-length prototype is currently under construction at CERN with the goal of developing the manufacturing and inspection procedures prior to launch the series production. For this, new tooling has been developed and optimized during the fabrication of fully representative practice coils. This paper describes the design of the magnet, the main manufacturing steps, and corresponding quality indicators, which will be used to monitor the series production. Finally, the production and installation schedule will be presented.

Design and Construction of the Full-Length Prototype of the 11-T Dipole Magnet for the High Luminosity LHC Project at CERN / F. Savary, B. Bordini, L. Fiscarelli, A.P. Foussat, L. Grand-Clement, F. Lackner, C.H. Loffler, M. Semeraro, D. Smekens, D.D. Ramos, H. Prin, R. Principe, L. Bottura, L. Rossi, S.I. Bermudez. - In: IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY. - ISSN 1051-8223. - 28:3(2018 Apr), pp. 8281473.1-8281473.6. [10.1109/TASC.2018.2800713]

Design and Construction of the Full-Length Prototype of the 11-T Dipole Magnet for the High Luminosity LHC Project at CERN

L. Rossi;
2018

Abstract

The luminosity upgrade of the Large Hadron Collider (LHC) at CERN requires the installation of additional collimators in the dispersion suppressor regions of the accelerator. The upgrade foresees the installation of one additional collimator on either side of interaction point 7 (IP7) at the location of the existing main dipoles (MBs) that will be replaced by shorter and more powerful dipoles, and of one additional collimator on either side of IP2 at the location of existing empty cryostats. This paper describes the design and the construction status of the full-length prototype of the 11-T dipole magnet, which is needed for IP7. This magnet features a two-in-one structure, like the LHC MB, impregnated coils made of Nb 3 Sn conductor, an inner bore of 60 mm, and a magnetic length of about 5.3 m. Two 11-T magnets are needed to replace a 15-m long MB. A by-pass cryostat placed in between the two magnets allows creating a room temperature space for the additional collimators. The magnet is designed to provide the same integrated field as the MB at nominal field. However, due to the difference in transfer function at lower field, a correction by means of a trim current has been considered. A full-length prototype is currently under construction at CERN with the goal of developing the manufacturing and inspection procedures prior to launch the series production. For this, new tooling has been developed and optimized during the fabrication of fully representative practice coils. This paper describes the design of the magnet, the main manufacturing steps, and corresponding quality indicators, which will be used to monitor the series production. Finally, the production and installation schedule will be presented.
accelerator magnet; high field Nb3Sn magnet; optimized production technology; superconducting magnet
Settore FIS/01 - Fisica Sperimentale
apr-2018
Article (author)
File in questo prodotto:
File Dimensione Formato  
08281473.pdf

accesso riservato

Tipologia: Publisher's version/PDF
Dimensione 807.05 kB
Formato Adobe PDF
807.05 kB Adobe PDF   Visualizza/Apri   Richiedi una copia
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2434/663701
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 8
  • ???jsp.display-item.citation.isi??? 7
social impact