The perspective to build large accelerators based on high gradient superconducting cavities posed a number of new problems that have been addressed in the preparation of the TESLA project. In this paper I mainly discuss the European contribution to the TESLA achievements and how they have been at the basis of the great impulse that the field is presently experiencing. Industrial production issues are focussed in terms of large scale production, reviewed quality control criteria and cost reduction.

SC RF studies in Europe / C. Pagani. - In: NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS. - ISSN 0920-5632. - 154:1(2006), pp. 149-156. ((Intervento presentato al convegno HIF : high intensity frontier workshop tenutosi a La Biodola, Isola d’Elba, Italy nel 2005 [10.1016/j.nuclphysbps.2006.01.052].

SC RF studies in Europe

C. Pagani
Primo
2006

Abstract

The perspective to build large accelerators based on high gradient superconducting cavities posed a number of new problems that have been addressed in the preparation of the TESLA project. In this paper I mainly discuss the European contribution to the TESLA achievements and how they have been at the basis of the great impulse that the field is presently experiencing. Industrial production issues are focussed in terms of large scale production, reviewed quality control criteria and cost reduction.
Settore ING-INF/01 - Elettronica
2006
Article (author)
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2434/41221
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact