The perspective to build large accelerators based on high gradient superconducting cavities posed a number of new problems that have been addressed in the preparation of the TESLA project. In this paper I mainly discuss the European contribution to the TESLA achievements and how they have been at the basis of the great impulse that the field is presently experiencing. Industrial production issues are focussed in terms of large scale production, reviewed quality control criteria and cost reduction.
SC RF studies in Europe / C. Pagani. - In: NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS. - ISSN 0920-5632. - 154:1(2006), pp. 149-156. ((Intervento presentato al convegno HIF : high intensity frontier workshop tenutosi a La Biodola, Isola d’Elba, Italy nel 2005 [10.1016/j.nuclphysbps.2006.01.052].
SC RF studies in Europe
C. PaganiPrimo
2006
Abstract
The perspective to build large accelerators based on high gradient superconducting cavities posed a number of new problems that have been addressed in the preparation of the TESLA project. In this paper I mainly discuss the European contribution to the TESLA achievements and how they have been at the basis of the great impulse that the field is presently experiencing. Industrial production issues are focussed in terms of large scale production, reviewed quality control criteria and cost reduction.Pubblicazioni consigliate
I metadati presenti in AIR sono rilasciati con licenza CCO mentre i file delle pubblicazioni sono rilasciati con licenza CC BY-SA, salvo diversa indicazione. In caso di violazione di copyright, contattare l'assistenza di AIR




