In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1] is a cryomodule being constructed by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1-Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules started in January 2010, and was just completed in May. In this paper, construction experience of the S1-Global cryomodule is presented.

Construction of the S1-global cryomodules for ILC / N. Ohuchi, E. Kako, Y. Kondou, H. Hayano, N. Higashi, H. Nakai, S. Noguchi, T. Saeki, M. Satoh, M. Sawabe, T. Shidara, T. Shishido, A. Terashima, K. Tsuchiya, K. Watanabe, A. Yamamoto, Y. Yamamoto, K. Yokoya, C. Pagani, P. Pierini, A. Bosotti, R. Pararella, T. Arkan, S. Barbanotti, H. Carter, M. Champion, R. Kephart, J. Kerby, D. Mitchell, Y. Orlov, M. Ross, T. Peterson, D. Kostin, L. Lilje, A. Matheisen, W. Moeller, H. Weise - In: IPAC'10 : the 1. International particle accelerator conference : proceedings : Kyoto, Japan, 23-28 May 2010 / [a cura di] A. Noda, C. Petit-Jean-Genaz, V. Schaa, T. Shirai, A. Shirakawa. - Kyoto : ACFA, 2010 Jun. - ISBN 9789290833529. - pp. 3356-3358 (( Intervento presentato al 1. convegno International particle accelerator conference: IPAC tenutosi a Kyoto (Japan) nel 2010.

Construction of the S1-global cryomodules for ILC

C. Pagani;
2010

Abstract

In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1] is a cryomodule being constructed by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1-Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules started in January 2010, and was just completed in May. In this paper, construction experience of the S1-Global cryomodule is presented.
accelerating gradient ; global projects ; global systems ; international collaborations ; international cooperation ; particle accelerators
Settore FIS/01 - Fisica Sperimentale
giu-2010
http://accelconf.web.cern.ch/AccelConf/IPAC10/papers/wepe008.pdf
Book Part (author)
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2434/233565
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 4
  • ???jsp.display-item.citation.isi??? ND
social impact