A brief summary of the design goals, description, and performance of the BABAR Silicon Vertex Tracker is given. Results from radiation hardness tests are discussed, which indicate satisfactory operation up to 5 Mrad of accumulated radiation. The local alignment procedure has made significant improvements recently, and four readout sections were recovered during the BABAR shutdown in 2002.
Status and future plans of the BABAR Silicon Vertex Tracker / V. Re, D. Kirkby, J. Berryhill, S. Burke, D. Callahan, C. Campagnari, B. Dahmes, D. Hale, P. Hart, S. Kyre, S. Levy, O. Long, M. Mazur, J. Richman, J. Stoner, W. Verkerke, J. Beringer, A. Eisner, M. Grothe, W. Lockman, T. Pulliam, A. Seiden, W. Walkowiak, M. Wilson, C. Borean, C. Bozzi, L. Piemontese, S. Laplace, A. Breon, D. Brown, E. Charles, A. Clark, S. Dardin, F. Goozen, L. Kerth, A. Gritsan, G. Lynch, A. Perazzo, N. Roe, G. Zizka, V. Lillard, D. Roberts, E. Brenna, M. Citterio, F. Lanni, F. Palombo, L. Ratti, P. Manfredi, E. Mandelli, C. Angelini, G. Batignani, S. Bettarini, M. Bondioli, F. Bosi, F. Bucci, G. Calderini, M. Carpinelli, M. Ceccanti, F. Forti, D. Gagliardi, M. Giorgi, A. Lusiani, P. Mammini, G. Marchiori, M. Morganti, F. Morsani, N. Neri, E. Paoloni, A. Profeti, M. Rama, G. Rizzo, F. Sandrelli, G. Simi, J. Walsh, P. Elmer, P. Burchat, C. Cheng, T. Meyer, C. Roat, M. Bona, F. Bianchi, D. Gamba, P. Trapani, L. Bosisio, G. Della Ricca, S. Dittongo, L. Lanceri, I. Rashevskaia, L. Vitale, G. Vuagnin, M. Datta, R. Liu. - In: NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH. SECTION A, ACCELERATORS, SPECTROMETERS, DETECTORS AND ASSOCIATED EQUIPMENT. - ISSN 0168-9002. - 511:1-2(2003), pp. 1-5.
Status and future plans of the BABAR Silicon Vertex Tracker
F. Palombo;N. Neri;
2003
Abstract
A brief summary of the design goals, description, and performance of the BABAR Silicon Vertex Tracker is given. Results from radiation hardness tests are discussed, which indicate satisfactory operation up to 5 Mrad of accumulated radiation. The local alignment procedure has made significant improvements recently, and four readout sections were recovered during the BABAR shutdown in 2002.Pubblicazioni consigliate
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.