In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1,2] is a cryomodule being constructed and tested by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1-Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules was completed in May 2010, and the cold test started from June 2010. In this paper, the international collaboration efforts of the S1-Global cryomodule are presented with the preliminary cold test results and the following test plans.

S1-global collaborative efforts - 8-cavity-cryomodule : 2 FNAL, 2 DESY and 4 KEK / N. Ohuchi, M. Akemoto, E. Kako, H. Katagiri, Y. Kojima, Y. Kondo, S. Fukuda, H. Hayano, N. Higashi, T. Matsumoto, H. Matsushita, S. Michizono, T. Miura, H. Nakai, H. Nakajima, S. Noguchi, M. Satoh, T. Shidara, T. Shishido, T. Takenaka, A. Terashima, N. Toge, K. Tsuchiya, K. Watanabe, S. Yamaguchi, A. Yamamoto, Y. Yamamoto, K. Yokoya, M. Yoshida, C. Pagani, P. Pierini, A. Bosotti, R. Paparella, T. Arkan, S. Barbanotti, H. Carter, M. Champion, B. Kephart, J. Kerby, D. Mitchell, Y. Orlov, T. Peterson, M. Ross, D. Kostin, L. Lilje, A. Matheisen, W. Moeller, N. Walker, H. Weise, C. Adolphsen, C. Nantista - In: Proceedings of 25. linear accelerator conference : LINAC10Tsukuba, Japan : JACoW, 2011 Apr. - pp. 31-35 (( Intervento presentato al 25. convegno Linear accelerator conference tenutosi a Tsukuba, Japan nel 2010.

S1-global collaborative efforts - 8-cavity-cryomodule : 2 FNAL, 2 DESY and 4 KEK

C. Pagani;
2011

Abstract

In an attempt to demonstrate an average accelerating gradient of 31.5 MV/m as in the design of the ILC, the S1-Global project [1,2] is a cryomodule being constructed and tested by an international collaboration hosted by KEK and including INFN, FNAL, DESY and SLAC. The S1-Global system joins two half-length cryomodules, each 6 m in length and containing 4 cavities, Module-C contains cavities from FNAL and DESY and was constructed by INFN. Module-A contains four KEK cavities and was constructed by KEK. The assembly of the cryomodules was completed in May 2010, and the cold test started from June 2010. In this paper, the international collaboration efforts of the S1-Global cryomodule are presented with the preliminary cold test results and the following test plans.
accelerating gradient ; cold tests ; global projects ; global systems ; international collaborations ; test plan ; international cooperation ; linear accelerators
Settore FIS/01 - Fisica Sperimentale
apr-2011
http://accelconf.web.cern.ch/AccelConf/LINAC2010/papers/mo302.pdf
Book Part (author)
File in questo prodotto:
Non ci sono file associati a questo prodotto.
Pubblicazioni consigliate

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/2434/233547
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 2
  • ???jsp.display-item.citation.isi??? ND
social impact